Wednesday 28 January 2009

Getting ready for 09 season

Over the winter i have been busy getting the bike ready for the 09 racing season.

  • Brake calipers from a cbr600 have been fitted with new brake fluid.

  • Replaced all anodised blue bolts with stainless steel bolts.
  • Re-packed exhaust end can.

  • Polished various components.
  • Painted various items.
  • Fitted new custom made alluminium clock bracket.
  • Serviced engine.
  • Powder coated spare wheels and fairing brackets.
  • Carbs set up on the dyno.
  • Quickshifter timed correctly.
  • Body work re-sprayed.
  • All new stickers made.
  • New light weight race rear brake disc.

All work carried out on the setting up of the carbs, engine & quickshifter are carried out by http://www.rjssuperbike.co.uk/.

Paint work by Freddy Dunn.

Race bodywork from http://www.ams-motorsport.co.uk/

Stickers from http://www.vinylmarksigns.co.uk/

Race rear disc & brake calipers from http://www.bmcracing.co.uk/

Custom clock bracket & exhaust re-packing done by Rod Jeacock.

Powder coating by DRA Coatings.

All other work carried out by my self.





More pictures to be added soon!